908-037 01/15/04Owners &InstallationManualFireplace Products International Ltd.6988 Venture St., Delta, B.C.Canada, V4G 1H4Tested by:Warnock Herse
10U20/E21 Gas Insert Zero Clearance KitON/OFFSwitchFan SpeedSwitch(Rear View)Wires toFan SwitchConnectorsSelf-adhesiveWire ClipFor GasConnectionWires
11U20/E21 Gas Insert Zero Clearance KitINSTALLATIONDiagram 410) Attach the brass trim to the faceplate by drilling a1/8" (3mm) hole through the f
Printed in Canada
2U20/E21 Gas Insert Zero Clearance KitTABLE OF CONTENTSU20/E21 GAS INSERT ZERO CLEARANCE KITCONTENTS PAGEListings &
3U20/E21 Gas Insert Zero Clearance KitSpecificationsINSTALLATIONLISTINGS AND CODE APPROVALSThis gas component has been tested in accordance with Natio
4U20/E21 Gas Insert Zero Clearance KitPARTSIncluded with Kit:1 Main Body Assembly (5 pieces)1 Faceplate Top Insulation1 Zero Clearance Top Louver Asse
5U20/E21 Gas Insert Zero Clearance KitINSTALLATIONADECFBLOCATING YOUR U20/E21 FIREPLACEDue to high temperatures the Insert should be located out of tr
6U20/E21 Gas Insert Zero Clearance KitINSTALLATIONKIT ASSEMBLYParts1) Top Assembly2) Base Assembly3) Back Panel4) Left Side Panel5) Right Side Panel6)
7U20/E21 Gas Insert Zero Clearance KitVariable Chimney RoutesVENTING1) This fireplace must be vented with a 4" (100mm)diameter Class “B” vent. Th
8U20/E21 Gas Insert Zero Clearance KitINSTALLATIONINSERT INSTALLATION1) Insert the U20/E21 Zero Clearance box into desiredlocation and frame according
9U20/E21 Gas Insert Zero Clearance KitINSTALLATIONOPTIONAL OUTSIDE COMBUSTION AIR SUPPLY INSTALLATIONA 4" (100 mm) dia. aluminum flex pipe or equ
Comments to this Manuals